|
In the period of this sub-plan, emphasis will be laid on the particle control
in the air pollution control and protection of drinking water sources in water
pollution control, thus to realize a fast improvement in the environmental
quality. To tackle both symptoms and causes, this process needs not only the
traditional end-of-pipe measures, but also the source reduction instruments like
promoting cleaner production, developing recycled economy, raising higher
standard, refining city plan, adjusting energy structure, improving industrial
layout, and introduction of automobiles at higher quality. In this way, the
total discharge of pollutants should be reduced significantly, leading
environmental pollution control to a new stage.
(1) Prevention and Control of Air Pollution
The air quality improvement of Beijing is a complex challenge that not only
involves the urban area, but also relies on the ecological improvement in the
whole city and the surrounding areas. While strengthening the initiative to
reduce air pollution within the urban area, citywide and regional ecological
improvement, agricultural and industrial structure adjustment, and rational
utilize of limited water resources are all of critical importance.
Prevention and control of coal-burning pollution: Beijing will greatly
increase the use of cleaner energy and reduce coal burning in the urban areas.
In 2007, the total coal consumption in the city will be reduced to less than 15
million tons from over 26 million tons in 2001; coal burned in the urban area
will be reduced from 16 million tons in 2001 to about 8 million tons with only
high quality coal with low sulfur content allowed in the city. At the same time,
efforts will be made to popularize the renewable energy, including solar,
geothermal and wind energy.
The second natural gas transmission pipeline from the gas field to Beijing
will be built to increase natural gas supply capacity to 5 billion cubic meters
in 2008.
Planned power transmission and distribution projects will be completed to
introduce power from the surrounding area into Beijing. Advanced technology,
like heat pump will be applied along with the urban rehabilitation to provide
electric heating service for about 20 million square meters' floor area in
2007.
Natural gas power generation projects in Beijing Third Co-generation Power
Plant and Gaojing Power Plant will be accomplished (the coal boiler in Gaojing
Power Plant will be closed to reduce coal burning by about 1.5 million tons).
New and expansion projects for gas-fired heat and cool co-generation plants will
be implemented at Taiyanggong, Caoqiao and other places. In addition, the
potential of the existing heating facilities will be tapped. With all these
measures; floor area with district heating supply will increase by another 50
million square meters by 2008.
Development of renewable energy is promoted to achieve sustainability.
Geothermal resources will be exploited to expend provide heating and cooling
service for around 5 million square meters floor area by 2008. Solar energy and
bio-mass energy utilization will receive high attention in rural area.
More attention will be paid to energy conservation regarding heat supply
system reform and promotion of building energy conservation. Further energy
consumption reduction in industries will be realized through restructuring and
technological advancement. It is targeted to reduce energy consumption for unit
GDP production by 6% annually to make Beijing join those of the leading cities
in the country.
By the end of 2005, all coal-burning boilers smaller than 14 MW in the urban
area will be converted to cleaner energy, including that of 14 MW or larger if
available. In the rural towns, it will also be encouraged to use cleaner energy
to replace coal-burning and those areas having no access to cleaner energy will
be encouraged to develop centralized heating system with cleaning coal
technology. In the preserved old urban bungalow area, clean energy will be used
for heating. The allowed coal-burning boilers of 14 MW or larger should comply
with stringent emission limits through use of low sulfur coal, highly effective
technology for desulfurization and dust removal and on-line monitoring
instruments.
Prevention and control of the vehicle emission pollution: Continue to give
priority to public transportation, and lay emphasis on rail transportation
(metro and light rail) so as to accelerate the development of the public
transportation system in the urban area.
More stringent vehicle emission limits will be introduced in the city: from
January 1, 2003, the light vehicle, heavy diesel vehicle will follow the
second-stage emission limits that is equivalent to Euro II, and in 2005, the
third-stage limits equivalent to Euro III will come into force. Moreover,
emission limits for other types of automobiles will be tightened. No new
automobiles failing to meet the limits will be allowed to enter Beijing's market
or be granted licenses. On the other hand, efforts shall also be made to
organize supply and sales of fuels matching the new limits. At the same time, it
will be encouraged to use the automobiles powered by cleaner fuels, fuel cell
vehicles, electricity-powered vehicles and other types of lower emission
vehicle. By 2007, 90% public buses and 70% taxies shall be converted to cleaner
energy.
Measures shall be made to accelerate the elimination of aging automobiles to
guarantee reduction of total vehicle emission while the vehicle fleet keeps
growing. Automobiles that have been in use by the end of 1992 will be discarded
by 2007; the taxies with more than 500,000 kilometers' driving age should be
timely scraped. Rules for eliminating the motorcycles will be formulated and
enforced and national stipulations on eliminating the vehicles for agricultural
use will be strictly enforced. More simplified dyna-mometer test lines will be
provided to apply this exhaust test approach to all in-use vehicles and the
limits will be lowered.
Environmental label management will be strengthened; traffic control will be
tightened according to different automobile exhaust levels and I/M system will
be mandated. Quality of the oil for automobile shall be safeguarded. Take
stronger measures in law enforcement by relying on the departments of both
environmental protection and traffic control so that more than 90% of the
automobiles' exhaust will come up to the limits.
On the basis of the improvement of the road traffic and the public transit
systems, reasonable number of parking lots in the downtown area shall be
provided with the price of parking set at reasonable level to control the
traffic flow volume on the motorway in the urban area. Measures will be taken to
divert transit vehicles from other parts of the country from entering the Fifth
Ring Road by 2004. Moreover, other measures to reduce traffic jam and encourage
people to use public transits and bicycles shall be adopted.
Prevention and control of air-borne dust pollution: All construction sites
must reach the standard stipulated for environmental protection and existing
effective measures and systems will carried on to control the dust pollution.
Resolute measures will be taken to control the air-borne dust raised on
motorways. All transportation vehicles for bulk cargo driving within the Fourth
Ring Road should be installed with enclosed tanks. By 2005, all the main
motorways in the urban area will be cleaned and water-sprayed through mechanized
equipment. Beijing Municipal Provision on Environmental Sanitation, Beijing
Municipal Provision on Greening and other stipulations will be strictly enforced
to further clarify the responsibility of relevant authorities and make regular
check-up and inspections. To 2005, no bare land will remain in the urban area
and city skirt. Management of the sand/stone farms will be tightened. To control
raising dust in the bare farmland, farmers will be required to leave the stubble
in the field without traditional plough.
Control of the secondary pollution. Above measures to cut the gaseous
pollutants are effective means for controlling the production of secondary
particles and ozone pollution. As well, to control VOC, active measures will be
taken to cut the emissions from industry and commercial activities, building
painting and daily life. By 2005, all the gas stations, main oil storage tanks
and the oil refinery enterprises in the city should have installed hermetical
oil gas recovery facilities. Open spray painting will be banned and enterprises
must install facilities to recycle and treat the waste gas. Use of organic
coating materials and organic dissolvent will be controlled while water
dissolvent coating materials and other substitute technology will be promoted.
The smoke from restaurants will be treated and the organic materials will be
reduced with the emissions reaching their relevant limits.
(2) Prevention and Control of Water Pollution
Water is the core of a healthy ecosystem. The prevention and control of water
pollution should consider reasonable development and utilization of regional
water resources and water cycle. According to the state plan on the pollution
control and management of the Haihe River Basin, emphasis is laid on the
protection of Miyun Reservoir and the groundwater sources and restoring the
Guanting reservoir as drinking water source. Great efforts will be made to
reclaim the effluent from the sewerage collection and treatment facilities to
provide more water for environmental, municipal purpose and production.
The protection of drinking water source to safeguard the quantity and quality
of water. Cooperation with the upper reaches area shall be strengthen in the
process of Haihe River Basin pollution control to safeguard the quantity and
quality of the water from upper reaches of Miyun and Guanting reservoirs. In
order to make Guanting reservoir resume the function of drinking water source,
pollution control projects will be implemented as planned. More trees will be
planted in the upper reaches of Miyun reservoir and Huairou reservoir to nourish
the water source and eliminate soil erosion. Taking control of N and P as the
focus, ecological agriculture in the surrounding area of the reservoirs will be
promoted, cultivated farmland will be converted back to forest. Further measures
will be taken to mitigate impact on the reservoirs by the production and life in
the surrounding towns and villages. Fish farming in the protection zone will be
banned. At the same time, the local rules and regulations will be strictly
observed to control the business and tourist activities in the protection zone.
Law enforcement team for the two reservoirs will be set up to carry out unified
supervision and management. More efforts will be make to prevent and control the
pollution in the aquifer of the groundwater supply zone in the western and
northern suburban. Development of the sewerage collection and treatment system
will be basically accomplished and sewerage percolation pits in the protection
zone of ground drinking water sources will all been eliminated. Relevant
measures for ecological agriculture, a large-scale water-source-nourishing
forest and the domestic refuse collection and treatment in the protection zone
of No.8 Waterworks will continue to be implement. Self-supply wells in the
groundwater over-extracted area will be phased out and the reconstruction and
expansion of existing water distribution network will be completed. Also,
management of ground water sources in the rural area will be tightened.
The comprehensive improvement of the urban sewage treatment system and water
environment. This work will be done in the Bahe River, Qinghe River, Liangshuihe
River, North-ring waterways and Wenyuhe River with a view to improving the water
quality of the lower reaches of the city. By 2008, about 90% of the urban sewage
will be collected and treated. Sewerage treatment plants will be established in
the satellite towns to ensure a treatment of 90% of sewage (secondary treatment)
and primary or secondary class sewerage treatment plants will be built in 80% of
the central towns. Sludge disposal facilities should be installed for the need
of sewerage treatment. In places where there is the demand, small wastewater
treatment facilities should be used to extract and treat sewerage directly to
provide water for cleaning, irrigation and municipal purpose. The new pipes and
network will be designed and built for treatment of early-stage rainfall.
Environmental management in the building and operation of the wastewater
treatment plants shall be improved, market-driven mechanism will be introduced
to promote commercially viable operation in wastewater sector. In 2007, the
centralized on-line monitoring system will be completed for the wastewater
treatment plants. Moreover, the supplying system of fresh water for the surface
waterways will be improved, water stored at Miyun and Guanting reservoir will be
effectively used to provide fresh water for the downstream. Management and
monitoring of the urban waterways shall be strengthened to ensure that water
quality can meet their respective functional standards.
(3) Solid Waste Management
Waste management policy, reduction, recycle and safe treatment, will be carry
on and waste management will be tightened based on the principle of recycle
economy. Such measures as substitution of coal, control of one-shot products,
simplifying commodity package, provision of pretreated vegetable to the urban
area and advocating healthy consumption, will be taken to cut the production of
industrial solid wastes, commercial garbage and domestic refuse at source and
promote recycling. 80% of industrial solid waste should be reused by 2005
through industrial restructuring, improved the existing reuse system for coal
ash and metallurgical residues and the provision of the treatment facilities for
gangue and tailings. Further improvement for reuse shall be pursuit. A strict
management system for hazardous waste will be developed to realize 100% safe
treatment and disposal. The hazardous waste that cannot be treated on-site will
be collected and treated in central treatment and disposal facilities such as
the new landfill site to be built. Another centralized treatment facility will
be built to treatment medical waste, and the centralized treatment rate should
reach 85% in 2005 and 90% in 2008. Management of the transportation, piling-up
and utilization of the construction wastes will be strengthened. The system for
separate collection, transportation and treatment of domestic refuse will be
improved, and the system for waste recycle will be well developed. In addition
to guarantee the normal running of the existing waste management facilities,
Jiaojiapo landfill site and a number of other facilities will be developed to
have all the domestic refuse in both the urban and the satellite towns receive
safe treatment by 2005. By the end of 2007, 80% of center towns should have
installed their own refuse treatment facilities. On-line monitoring system shall
be installed for urban domestic refuse treatment sites. Measures shall be taken
to prevent potential secondary pollution like air-borne dust, pollution of
groundwater, incineration exhaust exceeding the standards and odor from the
process of the collection and treatment of rubbish. At the same time,
supervision shall be tightened to prevent hazardous waste from being mixed with
urban domestic refuse, serious punishment will be imposed in case of
violation.
(4) Prevention and Control of Industrial Pollution
The aim of the prevention and control of industrial pollution is to
substantially cut the discharge. The primary approaches include implementation
of total discharge quantity control program, application of life-cycle control
and recycle economy, readjusting the industrial structure and layout,
improvement of environment management within the enterprise, popularization of
advanced technology, elimination of the outmoded technique and closing the
enterprises with heavy pollution. It should be continued to control over
pollution especially, the fugitive emission of air pollutants.
Enterprises will be encouraged to apply the notion of recycle economy into
the different links of their production. Recycle economy should be developed
gradually in major industries and 1-2 ecological industrial parks will be built.
ISO14000 environment management system and cleaner production will be promoted
among industries to apply life-cycle control and source reduction to cut the
pollutant discharge. On the basis of improved technology and sound management,
the township enterprises shall proceed with restructuring in terms of industrial
structure and product portfolio as well as pollution control. Environmental
Impact Assessment for relocation of polluting industries in the urban area will
be high-lighted to prevent the shift of the pollution toward the suburban
area.
By 2008, about 200 enterprises will be moved out of the south-eastern suburbs
and the Fourth Ring Road. In principle, the polluting enterprises in the
south-eastern suburbs will be closed down or moved out to have the lands along
the Fourth Ring Road be converted to commercial or residential area instead of
the industrial purpose. Control on the dust pollution in metallurgical and
cement production will be tightened with special focus on the fugitive
discharge. By the end of 2002, the Capital Steel & Iron Corporation will cut
its steel production by 2 million tons; and further reduction shall be realized
with the heavily polluting processes eliminated and the product portfolio
optimized to reduce pollution. The small and medium-sized building material
production enterprises in the far rural areas like Fangshan County, will be
readjusted gradually and closed down instead of high and new technology
processes. By 2005, all vertical kilns will be stopped and bring the cement
production scale under strict control.
(5) Management of Noise, Electro-Magnetic Radiation and Radioactivity
Urban and community planning shall be rationally refined. Control over the
noise caused by transportation, construction and social activity will be
tightened. The motorway planning will give full consideration of traffic noise,
at the proper sections, noise-deafening wall, noise-deafening structure and
low-noise road surface will be adopted. Moreover, the large lorries that enter
the city during night will be under strict control in the driving routes and
speed. No blow from any kind of automobiles will be permitted within the Forth
Ring Road and no whistle from the train will be allowed in the sensitive area of
the city. Residents along certain sections of the railway shall be resettled as
necessary, noise insulation wall shall be built along the railway and the urban
rails. Noise problem around the Capital Airport will be resolved as planned, and
special emphasis shall be laid on the harassment to the residents living at
vicinity of the airport expansion site.
Management over the report and registration of existing electric-magnetic
radiation and radioactive sources and radioactive waste shall be strengthened,
and the approval of new project shall be tightened. A management center for
radioactive environment will be established. Storehouse for radioactive waste
and the monitoring network and management system for radioactive environment
will be set up.
|